Package | hl7.fhir.us.breastcancer |
Type | StructureDefinition |
Id | Id |
FHIR Version | R3 |
Source | http://hl7.org/fhir/us/breastcancer/http://hl7.org/fhir/us/breastcancer/2018Sep/StructureDefinition-shr-core-TimePeriod-model.html |
Url | http://hl7.org/fhir/us/breastcancer/StructureDefinition/shr-core-TimePeriod-model |
Version | 0.2.0 |
Status | draft |
Date | 2018-08-17T00:00:00+10:00 |
Name | TimePeriodModel |
Title | BC TimePeriod Logical Model |
Experimental | False |
Realm | us |
Authority | hl7 |
Description | A period of time defined by a start and end time, date, or year. If the start element is missing, the start of the period is not known. If the end element is missing, it means that the period is ongoing, or the start may be in the past, and the end date in the future, which means that period is expected/planned to end at the specified time. The end value includes any matching date/time. For example, the period 2011-05-23 to 2011-05-27 includes all the times from the start of the 23rd May through to the end of the 27th of May. |
Type | shr-core-TimePeriod-model |
Kind | logical |
StructureDefinition | |
cimi-context-Abatement-model | BC Abatement Logical Model |
cimi-context-ConditionPresenceContext-model | BC ConditionPresenceContext Logical Model |
cimi-context-ObservationContext-model | BC ObservationContext Logical Model |
cimi-context-Onset-model | BC Onset Logical Model |
cimi-context-ParticipationPeriod-model | BC ParticipationPeriod Logical Model |
cimi-context-PresenceContext-model | BC PresenceContext Logical Model |
cimi-context-RecordedContext-model | BC RecordedContext Logical Model |
cimi-context-RelevantTime-model | BC RelevantTime Logical Model |
cimi-context-ResultValue-model | BC ResultValue Logical Model |
cimi-encounter-Encounter-model | BC Encounter Logical Model |
cimi-entity-CollectionTime-model | BC CollectionTime Logical Model |
cimi-entity-DateOfBirth-model | BC DateOfBirth Logical Model |
cimi-entity-GroupCharacteristic-model | BC GroupCharacteristic Logical Model |
cimi-entity-Member-model | BC Member Logical Model |
cimi-entity-Person-model | BC Person Logical Model |
cimi-entity-Practitioner-model | BC Practitioner Logical Model |
cimi-entity-Specimen-model | BC Specimen Logical Model |
cimi-statement-CodedLaboratoryObservation-model | BC CodedLaboratoryObservation Logical Model |
cimi-statement-ComponentOnlyNonLaboratoryObservation-model | BC ComponentOnlyNonLaboratoryObservation Logical Model |
cimi-statement-SimpleCodedLaboratoryObservation-model | BC SimpleCodedLaboratoryObservation Logical Model |
cimi-topic-EvaluationComponent-model | BC EvaluationComponent Logical Model |
oncology-BreastCancerDistantMetastasesClassification-model | BC BreastCancerDistantMetastasesClassification Logical Model |
oncology-BreastCancerGeneticAnalysisObservation-model | BC BreastCancerGeneticAnalysisObservation Logical Model |
oncology-BreastCancerHistologicGrade-model | BC BreastCancerHistologicGrade Logical Model |
oncology-BreastCancerPresenceStatement-model | BC BreastCancerPresenceStatement Logical Model |
oncology-BreastCancerPrimaryTumorClassification-model | BC BreastCancerPrimaryTumorClassification Logical Model |
oncology-BreastCancerRegionalNodesClassification-model | BC BreastCancerRegionalNodesClassification Logical Model |
oncology-BreastCancerStage-model | BC BreastCancerStage Logical Model |
oncology-BreastClinicalLymphNodeInvolvement-model | BC BreastClinicalLymphNodeInvolvement Logical Model |
oncology-BreastPathologicalLymphNodeInvolvement-model | BC BreastPathologicalLymphNodeInvolvement Logical Model |
oncology-BreastSpecimen-model | BC BreastSpecimen Logical Model |
oncology-BreastTumor-model | BC BreastTumor Logical Model |
oncology-ColdIschemiaTime-model | BC ColdIschemiaTime Logical Model |
oncology-DCISNuclearGrade-model | BC DCISNuclearGrade Logical Model |
oncology-EstrogenReceptorStatus-model | BC EstrogenReceptorStatus Logical Model |
oncology-HER2ReceptorStatus-model | BC HER2ReceptorStatus Logical Model |
oncology-HER2byFISH-model | BC HER2byFISH Logical Model |
oncology-HER2byIHC-model | BC HER2byIHC Logical Model |
oncology-Ki-67NuclearAntigen-model | BC Ki-67NuclearAntigen Logical Model |
oncology-MammaprintRecurrenceScore-model | BC MammaprintRecurrenceScore Logical Model |
oncology-OncotypeDxDCISRecurrenceScore-model | BC OncotypeDxDCISRecurrenceScore Logical Model |
oncology-OncotypeDxInvasiveRecurrenceScore-model | BC OncotypeDxInvasiveRecurrenceScore Logical Model |
oncology-ProgesteroneReceptorStatus-model | BC ProgesteroneReceptorStatus Logical Model |
oncology-ProsignaRecurrenceScore-model | BC ProsignaRecurrenceScore Logical Model |
oncology-TumorDimensions-model | BC TumorDimensions Logical Model |
oncology-TumorMargins-model | BC TumorMargins Logical Model |
No resources found
Note: links and images are rebased to the (stated) source
BC TimePeriod Logical Model
A period of time defined by a start and end time, date, or year. If the start element is missing, the start of the period is not known. If the end element is missing, it means that the period is ongoing, or the start may be in the past, and the end date in the future, which means that period is expected/planned to end at the specified time. The end value includes any matching date/time. For example, the period 2011-05-23 to 2011-05-27 includes all the times from the start of the 23rd May through to the end of the 27th of May.
{
"resourceType" : "StructureDefinition",
"id" : "shr-core-TimePeriod-model",
"text" : {
"status" : "generated",
"div" : "<div xmlns=\"http://www.w3.org/1999/xhtml\">\n <p><b>BC TimePeriod Logical Model</b></p>\n <p>A period of time defined by a start and end time, date, or year.\nIf the start element is missing, the start of the period is not known. If the end element is missing, it means that the period is ongoing, or the start may be in the past, and the end date in the future, which means that period is expected/planned to end at the specified time. The end value includes any matching date/time. For example, the period 2011-05-23 to 2011-05-27 includes all the times from the start of the 23rd May through to the end of the 27th of May.</p>\n</div>"
},
"url" : "http://hl7.org/fhir/us/breastcancer/StructureDefinition/shr-core-TimePeriod-model",
"identifier" : [
{
"system" : "http://hl7.org/fhir/us/breastcancer",
"value" : "shr.core.TimePeriod"
}
],
"version" : "0.2.0",
"name" : "TimePeriodModel",
"title" : "BC TimePeriod Logical Model",
"status" : "draft",
"date" : "2018-08-17T00:00:00+10:00",
"publisher" : "The HL7 Cancer Interoperability Group sponsored by Clinical Interoperability Council Work Group (CIC)",
"contact" : [
{
"telecom" : [
{
"system" : "url",
"value" : "http://www.hl7.org/Special/committees/cic/index.cfm"
}
]
}
],
"description" : "A period of time defined by a start and end time, date, or year.\nIf the start element is missing, the start of the period is not known. If the end element is missing, it means that the period is ongoing, or the start may be in the past, and the end date in the future, which means that period is expected/planned to end at the specified time. The end value includes any matching date/time. For example, the period 2011-05-23 to 2011-05-27 includes all the times from the start of the 23rd May through to the end of the 27th of May.",
"keyword" : [
{
"system" : "http://ncimeta.nci.nih.gov",
"code" : "C1948053"
}
],
"kind" : "logical",
"abstract" : false,
"type" : "shr-core-TimePeriod-model",
"baseDefinition" : "http://hl7.org/fhir/StructureDefinition/Element",
"derivation" : "specialization",
"snapshot" : {
"element" : [
{
"id" : "shr-core-TimePeriod-model",
"path" : "shr-core-TimePeriod-model",
"definition" : "A period of time defined by a start and end time, date, or year.\nIf the start element is missing, the start of the period is not known. If the end element is missing, it means that the period is ongoing, or the start may be in the past, and the end date in the future, which means that period is expected/planned to end at the specified time. The end value includes any matching date/time. For example, the period 2011-05-23 to 2011-05-27 includes all the times from the start of the 23rd May through to the end of the 27th of May.",
"min" : 0,
"max" : "*",
"base" : {
"path" : "shr-core-TimePeriod-model",
"min" : 0,
"max" : "*"
},
"mustSupport" : false,
"isModifier" : false,
"isSummary" : false
},
{
"id" : "shr-core-TimePeriod-model.timePeriodStart",
"path" : "shr-core-TimePeriod-model.timePeriodStart",
"code" : [
{
"system" : "http://ncimeta.nci.nih.gov",
"code" : "C1301880"
}
],
"short" : "The time at which something is to take effect, start, or did start. Boundary is considered inclusive.",
"definition" : "The time at which something is to take effect, start, or did start. Boundary is considered inclusive.",
"min" : 0,
"max" : "1",
"base" : {
"path" : "shr-core-TimePeriod-model.timePeriodStart",
"min" : 0,
"max" : "1"
},
"type" : [
{
"code" : "dateTime"
}
],
"mustSupport" : false,
"isModifier" : false,
"isSummary" : false
},
{
"id" : "shr-core-TimePeriod-model.timePeriodEnd",
"path" : "shr-core-TimePeriod-model.timePeriodEnd",
"code" : [
{
"system" : "http://ncimeta.nci.nih.gov",
"code" : "C1522314"
}
],
"short" : "The time at which something is to end or did end. Boundary is considered inclusive.",
"definition" : "The time at which something is to end or did end. Boundary is considered inclusive.",
"min" : 0,
"max" : "1",
"base" : {
"path" : "shr-core-TimePeriod-model.timePeriodEnd",
"min" : 0,
"max" : "1"
},
"type" : [
{
"code" : "dateTime"
}
],
"mustSupport" : false,
"isModifier" : false,
"isSummary" : false
}
]
},
"differential" : {
"element" : [
{
"id" : "shr-core-TimePeriod-model",
"path" : "shr-core-TimePeriod-model",
"definition" : "A period of time defined by a start and end time, date, or year.\nIf the start element is missing, the start of the period is not known. If the end element is missing, it means that the period is ongoing, or the start may be in the past, and the end date in the future, which means that period is expected/planned to end at the specified time. The end value includes any matching date/time. For example, the period 2011-05-23 to 2011-05-27 includes all the times from the start of the 23rd May through to the end of the 27th of May.",
"min" : 0,
"max" : "*",
"base" : {
"path" : "shr-core-TimePeriod-model",
"min" : 0,
"max" : "*"
},
"mustSupport" : false,
"isModifier" : false,
"isSummary" : false
},
{
"id" : "shr-core-TimePeriod-model.timePeriodStart",
"path" : "shr-core-TimePeriod-model.timePeriodStart",
"code" : [
{
"system" : "http://ncimeta.nci.nih.gov",
"code" : "C1301880"
}
],
"short" : "The time at which something is to take effect, start, or did start. Boundary is considered inclusive.",
"definition" : "The time at which something is to take effect, start, or did start. Boundary is considered inclusive.",
"min" : 0,
"max" : "1",
"base" : {
"path" : "shr-core-TimePeriod-model.timePeriodStart",
"min" : 0,
"max" : "1"
},
"type" : [
{
"code" : "dateTime"
}
],
"mustSupport" : false,
"isModifier" : false,
"isSummary" : false
},
{
"id" : "shr-core-TimePeriod-model.timePeriodEnd",
"path" : "shr-core-TimePeriod-model.timePeriodEnd",
"code" : [
{
"system" : "http://ncimeta.nci.nih.gov",
"code" : "C1522314"
}
],
"short" : "The time at which something is to end or did end. Boundary is considered inclusive.",
"definition" : "The time at which something is to end or did end. Boundary is considered inclusive.",
"min" : 0,
"max" : "1",
"base" : {
"path" : "shr-core-TimePeriod-model.timePeriodEnd",
"min" : 0,
"max" : "1"
},
"type" : [
{
"code" : "dateTime"
}
],
"mustSupport" : false,
"isModifier" : false,
"isSummary" : false
}
]
}
}
XIG built as of ??metadata-date??. Found ??metadata-resources?? resources in ??metadata-packages?? packages.